The guys skipped church this morning to work on the roof some more. There is snow and colder weather in the forecast so there is a little sense of urgency.

on siding on the north side while the rest worked on roofing. Evan ran the lift sending piles loaded on by jack, up to Brad on the roof. By the end of the day, the entire roof was on and some of the siding. We continue to use the Val 6 heater, a godsend. It is helping a little more as we go since we have some sides/roofing to help trap the heat. The picnics have been rather cool!
Bob looks on while Evan, Adam and Dale put up a header beam.